The William Knibb Centre

Main Contractor: Watson & Cox Ltd

Contract Value: £238K

Date: 2018

Details

An interesting glazing project which included the installation of parallel opening windows to give maximum ventilation, with the minimum projection beyond the face of the building. Also, including curtain walling screens, thermally insulated entrance doors and screen combinations.

Glazed in fixed blade louvres were fitted in windows to give added ventilation control. We also installed Aluprof MB-78E1 Silicone jointed glazed fire screens in the building.

Overall the building and incorporated products were very well received by all concerned parties.

Location

Montagu Street,
Kettering
NN16 8AE

Product Details

  • Smart Alitherm 700 Parallel opening windows
  • Smart Smartwall entrance doors & screens
  • Smart MC600 curtain walling
  • Aluprof MB-78EI (Fire Rated) screens & doors
  • RAL 7012 MATT