An interesting glazing project which included the installation of parallel opening windows to give maximum ventilation, with the minimum projection beyond the face of the building. Also, included were curtain walling screens, thermally insulated entrance doors and screen combinations.

Some glazed in fixed blade louvres were fitted in windows to give added ventilation control. Also, installed in the building were Aluprof MB-78E1 Silicone jointed glazed fire screens.

Overall the building and incorporated products was very well received by all concerned.

Location

Montagu St,
Kettering NN16 8AE

Product Details

  • Smart Alitherm 700 Parallel opening windows
  • Smart Smartwall Entrance doors & Screens
  • Smart MC600 curtain walling
  • Aluprof MB-78EI (Fire Rated) Screens & Doors
  • RAL 7012 MATT