23 – 30 Hosier Lane, London

Main Contractor: Gilbert Ash

Contract Value: £700K

Date: 2019

Details

Part new build and part refurbishment contract in conjunction with an approved main contractor for Whitbread PLC. Dotcom Glazing Ltd was required to supply and install a range of thermal insulated and fire rated aluminium glazing products to meet the required specification, and because of the location some elevations required extra sound insulation which was achieved by installing an Aluprof secondary glazing system.

The project was completed on time and to the satisfaction of all concerned.

Location

London

Product Details

  • MB-86SI
  • MB-78SI (Fire rated)
  • Smartwall Door
  • MB-45 (Secondary Glazing)
  • Colours – 068/60306 (Tiger Coatings)
  • Bronzed Anodized
Related Projects