Bilton College

Main Contractor: Dotcom Glazing Ltd (Direct)

Contract Value: £236K

Date: 2013

Details

Dotcom removed the existing screen from each of the three floor levels and installed the lowrise SC curtain walling system into the apertures whilst necessitating any disturbance to internal stall risers, plumbing, IT, and electrical services. The SC curtain walling system proved perfect for the job.

Resulting in very little inconvenience to the College and minimal loss of valuable classroom usage.

The College were so pleased with the procedure and performance of the operation that further work secured.

Location

Lawford Lane,
Rugby
CV22 7JT

Product Details

  • Smart S C Frame
  • 
RAL 9016 Gloss
Related Projects